NOISIEL (77)
CULTURE
ÉDUCATION
CINÉMA ART ET ESSAI
EXPOSITIONS
CENTRE DE LOISIR
RESTRUCTURATION
EXTENSION
LIVRAISON 2019
Our idea starts with the fact that “La Ferme du Buisson” (cinema theatre) has lost some parts in its south-eastern side and we propose to perform a “transplant” of a building compatible with the existing ones. In architecture, this addition must meet two requirements. The first is functional and technical, the original part must meet the new regulations and allow for an optimised functioning. The second requirement is formal: the extension must interact with the existing building with altogether continuity, rupture, and opposition. In this case, the extension of the cinema theatre is an opportunity to remodel it into a redefined and soundproofed auditorium, to make circulation more fluid by creating convivial spaces, and on the other hand, to entirely connect these remodelled parts to the new ones.
82
GREFF CULTURE
CLIENT
PARIS CITY – MARNE VALLEY
ARCHITECT
FARIDAZIB ARCHITECTS
ASSOCIATE ARCHITECTS
LINÉAIRE A
SURFACE
2 745 m² (Net Surface Area)
COST
8.35 M€
SKETCH
2014
DELIVERY DATE
2019
ASSIGNMENT
COMPLETE ASSIGNMENT
ENGINEERING FIRMS
OREGON, WOR, MOTIC, IMPÉDANCE
PHOTOGRAPHER
DAVID BOUREAU