Terville (57)
EQUIPEMENT
GYM, DOJO
TENNIS CLUB, DANCE
SHOPS
URBAN LAYOUT
NEW CONSTRUCTION
2013-2015 FOREWORK
2018 FOREWORK
The building is designed as a superposition of several functions, like the combustion stages of a blast furnace. The crucible, the stall, the belly, the tank, and the throat are the many chambers or levels that make up the building. The shops, the gym, the dojo, the dance hall, and the roof tennis courts are built on the same logic: all in superposition and in height!
092
STEEL
CLIENT
TERVILLE TOWN
ARCHITECT
FARIDAZIB ARCHITECTS
SURFACE
6 806 m² / 12 000 m²
COST
13.908 M€
SKETCH
APS 2013, PC 2013, APD 2014, stopped 2015
ENGINEERING FIRMS
EVP, ID+, BASE,GRANDMOUGIN
ILLUSTRATION
ROMAIN GHOMARI